Axelrod Pavilion - axelrodpavilion

View of Finishes

Substantial Completion June 10, 2011

Main Lobby with Decorative Glass.JPG
Main Lobby with Decorative Glass.JPG
Main Lobby with Decorative Glass.JPG 2011-07-07
Main Lobby Reception Desk.JPG
Main Lobby Reception Desk.JPG
Main Lobby Reception Desk.JPG 2011-07-07
Main Lobby & Resource Library.JPG
Main Lobby & Resource Library.JPG
Main Lobby & Resource Library.JPG 2011-07-07
Susan Cheek Needler Breast Center Registration Desk.JPG
Susan Cheek Needler Breast Center Registration Desk.JPG
Susan Cheek Needler Breast Center Registration Desk.JPG 2011-07-07
Breast Center Registration Office.JPG
Breast Center Registration Office.JPG
Breast Center Registration Office.JPG 2011-06-29
Breast Center Registration Office (2).JPG
Breast Center Registration Office (2).JPG
Breast Center Registration Office (2).JPG 2011-06-29
CT Scan Room.JPG
CT Scan Room.JPG
CT Scan Room.JPG 2011-07-07
Corridor - Feature Wall.JPG
Corridor - Feature Wall.JPG
Corridor - Feature Wall.JPG 2011-07-07
Dr. Blumencranz Office from 2nd Floor Lobby.JPG
Dr. Blumencranz Office from 2nd Floor Lobby.JPG
Dr. Blumencranz Office from 2nd Floor Lobby.JPG 2011-07-07
2nd Floor Conference Room.JPG
2nd Floor Conference Room.JPG
2nd Floor Conference Room.JPG 2011-07-07
Conference Room Entry Tribute Wall.JPG
Conference Room Entry Tribute Wall.JPG
Conference Room Entry Tribute Wall.JPG 2011-07-07

Interior Finishes

2011-05-16 Interior Finishes

Interior Paint.jpg
Interior Paint.jpg
Interior Paint.jpg 2011-03-17
Interior Primer.jpg
Interior Primer.jpg
Interior Primer.jpg 2011-03-17
Axiom Installation with Finish Paint.jpg
Axiom Installation with Finish Paint.jpg
Axiom Installation with Finish Paint.jpg 2011-04-21
Hallway Axiom  & Finish Detail.jpg
Hallway Axiom & Finish Detail.jpg
Hallway Axiom & Finish Detail.jpg 2011-05-02
Dr. Blumencranz Lobby & Reception Area.jpg
Dr. Blumencranz Lobby & Reception Area.jpg
Dr. Blumencranz Lobby & Reception Area.jpg 2011-04-29
Corner & Wall Guards.jpg
Corner & Wall Guards.jpg
Corner & Wall Guards.jpg 2011-04-07
Painted Corridor with Wall Guard.jpg
Painted Corridor with Wall Guard.jpg
Painted Corridor with Wall Guard.jpg 2011-04-06
Ceiling Drywall - Lobby.jpg
Ceiling Drywall - Lobby.jpg
Ceiling Drywall - Lobby.jpg 2011-04-07
Interior Stone Paneling - Lobby.jpg
Interior Stone Paneling - Lobby.jpg
Interior Stone Paneling - Lobby.jpg 2011-04-07
City-scape Wall Tile - 2nd Floor Lobby.jpg
City-scape Wall Tile - 2nd Floor Lobby.jpg
City-scape Wall Tile - 2nd Floor Lobby.jpg 2011-04-29
Ceiling Grid Installation.jpg
Ceiling Grid Installation.jpg
Ceiling Grid Installation.jpg 2011-03-22
Acoustical Ceiling Tile Border Installation.jpg
Acoustical Ceiling Tile Border Installation.jpg
Acoustical Ceiling Tile Border Installation.jpg 2011-05-13
Ceiling Elevations, Resource Library, 4.30.11.jpg
Ceiling Elevations, Resource Library, 4.30.11.jpg
Ceiling Elevations, Resource Library, 4.30.11.jpg 2011-05-02
Lighting Fixture with Decorative Panel.jpg
Lighting Fixture with Decorative Panel.jpg
Lighting Fixture with Decorative Panel.jpg 2011-05-01
Overhead Lighting.jpg
Overhead Lighting.jpg
Overhead Lighting.jpg 2011-04-01
IMG_1029.jpg
IMG_1029.jpg
IMG_1029.jpg 2011-04-01
Overhead Lighting & Diffuser.jpg
Overhead Lighting & Diffuser.jpg
Overhead Lighting & Diffuser.jpg 2011-04-06
Automatic Doors - Front Entrance.jpg
Automatic Doors - Front Entrance.jpg
Automatic Doors - Front Entrance.jpg 2011-05-12
Double Doors.jpg
Double Doors.jpg
Double Doors.jpg 2011-04-21
Plaster Veneer - Dressing Room.jpg
Plaster Veneer - Dressing Room.jpg
Plaster Veneer - Dressing Room.jpg 2011-05-05
Veneer Plaster & Overhead Lighting - 1st Floor.jpg
Veneer Plaster & Overhead Lighting - 1st Floor.jpg
Veneer Plaster & Overhead Lighting - 1st Floor.jpg 2011-05-05
Veneer Plaster on Columns.jpg
Veneer Plaster on Columns.jpg
Veneer Plaster on Columns.jpg 2011-05-01
Mop Sink.jpg
Mop Sink.jpg
Mop Sink.jpg 2011-05-13
Stairwell Paint in Progress.jpg
Stairwell Paint in Progress.jpg
Stairwell Paint in Progress.jpg 2011-05-01

2011-05-16 Wall & Floor Tile

Ceramic Tile Installation.jpg
Ceramic Tile Installation.jpg
Ceramic Tile Installation.jpg 2011-05-01
Bathroom Tile Installation - 1st Floor.jpg
Bathroom Tile Installation - 1st Floor.jpg
Bathroom Tile Installation - 1st Floor.jpg 2011-05-04
IMG_1550.jpg
IMG_1550.jpg
IMG_1550.jpg 2011-05-11
IMG_1552.jpg
IMG_1552.jpg
IMG_1552.jpg 2011-05-11
IMG_1520.jpg
IMG_1520.jpg
IMG_1520.jpg 2011-05-05
IMG_1637.jpg
IMG_1637.jpg
IMG_1637.jpg 2011-05-12
Bathroom Tile Prior to Caulking.jpg
Bathroom Tile Prior to Caulking.jpg
Bathroom Tile Prior to Caulking.jpg 2011-05-13

2011-05-16 Flooring

Installation of Luxury Vinyl Planks.jpg
Installation of Luxury Vinyl Planks.jpg
Installation of Luxury Vinyl Planks.jpg 2011-05-12
Luxury Vinyl Planks.jpg
Luxury Vinyl Planks.jpg
Luxury Vinyl Planks.jpg 2011-05-11
IMG_1686.jpg
IMG_1686.jpg
IMG_1686.jpg 2011-05-13
Sheet Vinyl Installation.jpg
Sheet Vinyl Installation.jpg
Sheet Vinyl Installation.jpg 2011-05-13

2011-05-16 Lobby Railing

Lobby Handrails Installation.jpg
Lobby Handrails Installation.jpg
Lobby Handrails Installation.jpg 2011-04-21
Installation of Glass
Installation of Glass
IMG_1546.jpg 2011-05-11
IMG_1595.jpg
IMG_1595.jpg
IMG_1595.jpg 2011-05-11
Glass Installation
Glass Installation
IMG_1568.jpg 2011-05-11
View of Handrails from 2nd Floor Lobby
View of Handrails from 2nd Floor Lobby
IMG_1571.jpg 2011-05-11
Wood Wall Covering
Wood Wall Covering
IMG_1620.jpg 2011-05-12
Wood Wall Covering
Wood Wall Covering
IMG_1626.jpg 2011-05-12

Exterior

2011-05-24 Roof

Cap Sheet Installation.jpg
Cap Sheet Installation.jpg
Cap Sheet Installation.jpg 2011-05-04
Cap Sheet Installation
Cap Sheet Installation
IMG_1600.jpg 2011-05-12
IMG_1494.jpg
IMG_1494.jpg
IMG_1494.jpg 2011-05-04
IMG_1601.jpg
IMG_1601.jpg
IMG_1601.jpg 2011-05-12
Mechanical Penthouse with Coping Installed.jpg
Mechanical Penthouse with Coping Installed.jpg
Mechanical Penthouse with Coping Installed.jpg 2011-05-15

2011-05-16 Phase III Sitework

IMG_1536.jpg
IMG_1536.jpg
IMG_1536.jpg 2011-05-11
IMG_1537.jpg
IMG_1537.jpg
IMG_1537.jpg 2011-05-11
IMG_1575.jpg
IMG_1575.jpg
IMG_1575.jpg 2011-05-11
IMG_1695.jpg
IMG_1695.jpg
IMG_1695.jpg 2011-05-13
IMG_1729.jpg
IMG_1729.jpg
IMG_1729.jpg 2011-05-15
IMG_1732.jpg
IMG_1732.jpg
IMG_1732.jpg 2011-05-15
IMG_1733.jpg
IMG_1733.jpg
IMG_1733.jpg 2011-05-15
IMG_1737.jpg
IMG_1737.jpg
IMG_1737.jpg 2011-05-15
Sidewalk Installation - South Side.jpg
Sidewalk Installation - South Side.jpg
Sidewalk Installation - South Side.jpg 2011-04-06
IMG_1618.jpg
IMG_1618.jpg
IMG_1618.jpg 2011-05-12
Light Pole Installation.jpg
Light Pole Installation.jpg
Light Pole Installation.jpg 2011-05-05

Stone Paneling

Stone Panel Installation

Stone Paneling at Retaining Wall.jpg
Stone Paneling at Retaining Wall.jpg
Stone Paneling at Retaining Wall.jpg 2011-03-24
Exterior Stone Panel  - East Side.jpg
Exterior Stone Panel - East Side.jpg
Exterior Stone Panel - East Side.jpg 2011-04-06
Stone Panel at Resource Library.jpg
Stone Panel at Resource Library.jpg
Stone Panel at Resource Library.jpg 2011-04-06
Interior Stone Panel - Lobby.jpg
Interior Stone Panel - Lobby.jpg
Interior Stone Panel - Lobby.jpg 2011-04-07

Videos


Setting of RTU Unit, 2.25.11.avi

Installation of Glass at Window Assembly

MEP Equipment

Mechanical, Electrical & Plumbing Equipment

Arrival of Temporary RTU Units.jpg
Arrival of Temporary RTU Units.jpg
Arrival of Temporary RTU Units.jpg 2011-02-25
(2) Temporary 25-ton RTU Units Set, 2.25.11.jpg
(2) Temporary 25-ton RTU Units Set, 2.25.11.jpg
(2) Temporary 25-ton RTU Units Set, 2.25.11.jpg 2011-03-01
Preparing to fly the chiller to the roof, 3.3.11.jpg
Preparing to fly the chiller to the roof, 3.3.11.jpg
Preparing to fly the chiller to the roof, 3.3.11.jpg 2011-03-03
Rooftop Mechanical, 3.1.11.jpg
Rooftop Mechanical, 3.1.11.jpg
Rooftop Mechanical, 3.1.11.jpg 2011-03-01
Mechanical Room (Chilled Water Pump, Steam Condensate Pump, and Steam Converter)
Mechanical Room (Chilled Water Pump, Steam Condensate Pump, and Steam Converter)
Mechanical Room (Chilled Water Pump, Steam Condensate Pump, and Steam Converter) 3.1.11.jpg 2011-03-01
Fire Main and Pumps, 2.24.11.jpg
Fire Main and Pumps, 2.24.11.jpg
Fire Main and Pumps, 2.24.11.jpg 2011-02-24
Electrical Room, 2.21.11.jpg
Electrical Room, 2.21.11.jpg
Electrical Room, 2.21.11.jpg 2011-02-21

Glass Installation

Glass Installation

Glass Installation.jpg
Glass Installation.jpg
Glass Installation.jpg 2011-01-25
Glass Installation, NE Side of Bldg - 2.21.11.jpg
Glass Installation, NE Side of Bldg - 2.21.11.jpg
Glass Installation, NE Side of Bldg - 2.21.11.jpg 2011-02-14
Glass Installation, West Side - 2.14.11.jpg
Glass Installation, West Side - 2.14.11.jpg
Glass Installation, West Side - 2.14.11.jpg 2011-02-13
East Curtainwall Glass Installation, 2.14.11.jpg
East Curtainwall Glass Installation, 2.14.11.jpg
East Curtainwall Glass Installation, 2.14.11.jpg 2011-02-13
Exterior - Library Resource Bump-Out, 2.28.11.jpg
Exterior - Library Resource Bump-Out, 2.28.11.jpg
Exterior - Library Resource Bump-Out, 2.28.11.jpg 2011-03-01
Storefront Glass, 3.1.11.jpg
Storefront Glass, 3.1.11.jpg
Storefront Glass, 3.1.11.jpg 2011-03-01
Curtainwall Glass, East Side - 2.21.11.jpg
Curtainwall Glass, East Side - 2.21.11.jpg
Curtainwall Glass, East Side - 2.21.11.jpg 2011-02-14
West Curtainwall, 2.14.11.jpg
West Curtainwall, 2.14.11.jpg
West Curtainwall, 2.14.11.jpg 2011-02-13

Lightweight Concrete - Low Roof & Mechanical Penthouse

2011-01-19

Styrofoam Base.jpg
Styrofoam Base.jpg
Styrofoam Base.jpg 2010-12-28
Syrofoam base installed; concrete pour in progress.jpg
Syrofoam base installed; concrete pour in progress.jpg
Syrofoam base installed; concrete pour in progress.jpg 2010-12-30
Lightweight Concrete - Low Roof.jpg
Lightweight Concrete - Low Roof.jpg
Lightweight Concrete - Low Roof.jpg 2010-12-30
Lightweight concrete in progress.jpg
Lightweight concrete in progress.jpg
Lightweight concrete in progress.jpg 2010-12-30
Lightweight concrete.jpg
Lightweight concrete.jpg
Lightweight concrete.jpg 2010-12-30
Lightweight concrete -Mechanical Penthouse.jpg
Lightweight concrete -Mechanical Penthouse.jpg
Lightweight concrete -Mechanical Penthouse.jpg 2010-12-30

Overhead Mechanical, Electrical, Plumbing

Overhead MEP

Overhead MEP 008.jpg
Overhead MEP 008.jpg
Axelrod Dec (New Camera) 008.jpg 2010-12-16
Overhead Ductwork 018.jpg
Overhead Ductwork 018.jpg
Axelrod Dec (New Camera) 018.jpg 2010-12-16
Overhead Ductwork 023.jpg
Overhead Ductwork 023.jpg
Axelrod Dec (New Camera) 023.jpg 2010-12-16
Overhead MEP 024.jpg
Overhead MEP 024.jpg
Axelrod Dec (New Camera) 024.jpg 2010-12-16
Overhead MEP 155.jpg
Overhead MEP 155.jpg
Axelrod Dec (New Camera) 155.jpg 2011-01-05
Overhead Ductwork157.jpg
Overhead Ductwork157.jpg
Axelrod Dec (New Camera) 157.jpg 2011-01-05
Overhead Ductwork 158.jpg
Overhead Ductwork 158.jpg
Axelrod Dec (New Camera) 158.jpg 2011-01-05
Overhead MEP 159.jpg
Overhead MEP 159.jpg
Axelrod Dec (New Camera) 159.jpg 2011-01-05

Roof Curbs

11-22-10 Roof Deck

Pitched Roof Deck 0006.jpg
Pitched Roof Deck 0006.jpg
Pitched Roof Deck 0006.jpg 2010-11-11
IMG_0001.jpg
IMG_0001.jpg
IMG_0001.jpg 2010-11-11
IMG_0002.jpg
IMG_0002.jpg
IMG_0002.jpg 2010-11-11
IMG_0003.jpg
IMG_0003.jpg
IMG_0003.jpg 2010-11-11
IMG_0007.jpg
IMG_0007.jpg
IMG_0007.jpg 2010-11-11
IMG_0008.jpg
IMG_0008.jpg
IMG_0008.jpg 2010-11-11
IMG_0009.jpg
IMG_0009.jpg
IMG_0009.jpg 2010-11-11
IMG_0011.jpg
IMG_0011.jpg
IMG_0011.jpg 2010-11-11
Exhaust Fans, 11.12.10 _0005.jpg
Exhaust Fans, 11.12.10 _0005.jpg
Exhaust Fans, 11.12.10 _0005.jpg 2010-11-11

11-20-10 Spray-On Fireproofing

2010-11-22

Application of Spray On Fireproofing_0220.jpg
Application of Spray On Fireproofing_0220.jpg
Application of Spray On Fireproofing_0220.jpg 2010-11-03
Spray On Fireproofing _0214.jpg
Spray On Fireproofing _0214.jpg
Spray On Fireproofing _0214.jpg 2010-11-03
Spray On Fireproofing_0216.jpg
Spray On Fireproofing_0216.jpg
Spray On Fireproofing_0216.jpg 2010-11-03
Spray-on Fireproofing Application _0213.jpg
Spray-on Fireproofing Application _0213.jpg
Spray-on Fireproofing Application _0213.jpg 2010-11-03
Beam Fireproofing & Exterior Framing 11.4.10 012.jpg
Beam Fireproofing & Exterior Framing 11.4.10 012.jpg
Beam Fireproofing & Exterior Framing 11.4.10 012.jpg 2010-11-03
Exterior Framing & Beam Fireproofing 11.4.10 013.jpg
Exterior Framing & Beam Fireproofing 11.4.10 013.jpg
Exterior Framing & Beam Fireproofing 11.4.10 013.jpg 2010-11-03

Exterior Framing

11-09-10

Axlerod Site thru 11.2.10 073.jpg
Axlerod Site thru 11.2.10 073.jpg
Axlerod Site thru 11.2.10 073.jpg 2010-10-18
Axlerod Site thru 11.2.10 074.jpg
Axlerod Site thru 11.2.10 074.jpg
Axlerod Site thru 11.2.10 074.jpg 2010-10-18
Axlerod Site thru 11.2.10 086.jpg
Axlerod Site thru 11.2.10 086.jpg
Axlerod Site thru 11.2.10 086.jpg 2010-10-18
Axlerod  Construction Progress Oct 2010 197.jpg
Axlerod Construction Progress Oct 2010 197.jpg
Axlerod Construction Progress Oct 2010 197.jpg 2010-11-03
Exterior Framing Oct 2010 274.jpg
Exterior Framing Oct 2010 274.jpg
Exterior Framing Oct 2010 274.jpg 2010-11-09

11-15-10 Scaffolding

2010-11-22 Scaffolding

Axlerod Site thru 11.2.10 133.jpg
Axlerod Site thru 11.2.10 133.jpg
Axlerod Site thru 11.2.10 133.jpg 2010-10-27
Axlerod Site thru 11.2.10 150.jpg
Axlerod Site thru 11.2.10 150.jpg
Axlerod Site thru 11.2.10 150.jpg 2010-10-28
Axlerod Site thru 11.2.10 168.jpg
Axlerod Site thru 11.2.10 168.jpg
Axlerod Site thru 11.2.10 168.jpg 2010-10-28
Scaffolding - East Side 11.4.10 011.jpg
Scaffolding - East Side 11.4.10 011.jpg
Scaffolding - East Side 11.4.10 011.jpg 2010-11-03
View of Scaffolding Braced to Structure_0218.jpg
View of Scaffolding Braced to Structure_0218.jpg
View of Scaffolding Braced to Structure_0218.jpg 2010-11-03

Slab-on-Grade

11-2-10 Slab-On-Grade

Axlerod Site thru 11.2.10 091.jpg
Axlerod Site thru 11.2.10 091.jpg
Axlerod Site thru 11.2.10 091.jpg 2010-10-20
Axlerod Site thru 11.2.10 094.jpg
Axlerod Site thru 11.2.10 094.jpg
Axlerod Site thru 11.2.10 094.jpg 2010-10-20
Axlerod Site thru 11.2.10 116.jpg
Axlerod Site thru 11.2.10 116.jpg
Axlerod Site thru 11.2.10 116.jpg 2010-10-21
Axlerod Site thru 11.2.10 120.jpg
Axlerod Site thru 11.2.10 120.jpg
Axlerod Site thru 11.2.10 120.jpg 2010-10-21
Axlerod  Construction Progress Oct 2010 122.jpg
Axlerod Construction Progress Oct 2010 122.jpg
Axlerod Construction Progress Oct 2010 122.jpg 2010-10-21
Axlerod Site thru 11.2.10 121.jpg
Axlerod Site thru 11.2.10 121.jpg
Axlerod Site thru 11.2.10 121.jpg 2010-10-21
Axlerod  Construction Progress Oct 2010 186.jpg
Axlerod Construction Progress Oct 2010 186.jpg
Axlerod Construction Progress Oct 2010 186.jpg 2010-11-02
Axlerod  Construction Progress Oct 2010 202.jpg
Axlerod Construction Progress Oct 2010 202.jpg
Axlerod Construction Progress Oct 2010 202.jpg 2010-11-03
Axlerod  Construction Progress Oct 2010 203.jpg
Axlerod Construction Progress Oct 2010 203.jpg
Axlerod Construction Progress Oct 2010 203.jpg 2010-11-03
Axlerod  Construction Progress Oct 2010 258.jpg
Axlerod Construction Progress Oct 2010 258.jpg
Axlerod Construction Progress Oct 2010 258.jpg 2010-11-09
Axlerod  Construction Progress Oct 2010 262.jpg
Axlerod Construction Progress Oct 2010 262.jpg
Axlerod Construction Progress Oct 2010 262.jpg 2010-11-09

Underslab Utilities

11-20-2010 Underslab Utilities

IMG_0283.jpg
IMG_0283.jpg
IMG_0283.jpg 2010-10-05
IMG_0284.jpg
IMG_0284.jpg
IMG_0284.jpg 2010-10-05
IMG_0286.jpg
IMG_0286.jpg
IMG_0286.jpg 2010-10-05
IMG_0285.jpg
IMG_0285.jpg
IMG_0285.jpg 2010-10-05
Axlerod  Construction Progress Oct 2010 022.jpg
Axlerod Construction Progress Oct 2010 022.jpg
Axlerod Construction Progress Oct 2010 022.jpg 2010-10-10
Axlerod Site thru 11.2.10 002.jpg
Axlerod Site thru 11.2.10 002.jpg
Axlerod Site thru 11.2.10 002.jpg 2010-10-10
Axlerod Site thru 11.2.10 003.jpg
Axlerod Site thru 11.2.10 003.jpg
Axlerod Site thru 11.2.10 003.jpg 2010-10-10
Axlerod Site thru 11.2.10 004.jpg
Axlerod Site thru 11.2.10 004.jpg
Axlerod Site thru 11.2.10 004.jpg 2010-10-10
Axlerod Site thru 11.2.10 005.jpg
Axlerod Site thru 11.2.10 005.jpg
Axlerod Site thru 11.2.10 005.jpg 2010-10-10
Axlerod Site thru 11.2.10 017.jpg
Axlerod Site thru 11.2.10 017.jpg
Axlerod Site thru 11.2.10 017.jpg 2010-10-10
Axlerod Site thru 11.2.10 173.jpg
Axlerod Site thru 11.2.10 173.jpg
Axlerod Site thru 11.2.10 173.jpg 2010-11-01
Axlerod Site thru 11.2.10 174.jpg
Axlerod Site thru 11.2.10 174.jpg
Axlerod Site thru 11.2.10 174.jpg 2010-11-01
Axlerod Site thru 11.2.10 015.jpg
Axlerod Site thru 11.2.10 015.jpg
Axlerod Site thru 11.2.10 015.jpg 2010-10-10
Axlerod Site thru 11.2.10 045.jpg
Axlerod Site thru 11.2.10 045.jpg
Axlerod Site thru 11.2.10 045.jpg 2010-10-14
IMG_0266.jpg
IMG_0266.jpg
IMG_0266.jpg 2010-10-05
Axlerod Site thru 11.2.10 032.jpg
Axlerod Site thru 11.2.10 032.jpg
Axlerod Site thru 11.2.10 032.jpg 2010-10-13
Axlerod Site thru 11.2.10 040.jpg
Axlerod Site thru 11.2.10 040.jpg
Axlerod Site thru 11.2.10 040.jpg 2010-10-14
Axlerod  Construction Progress Oct 2010 276.jpg
Axlerod Construction Progress Oct 2010 276.jpg
Axlerod Construction Progress Oct 2010 276.jpg 2010-11-09

October 8, 2010 Canopy and Front Entrance Foundation and Steel

10-06-10 Canopy and Front Entrance Build-Out

IMG_0199.jpg
IMG_0199.jpg
IMG_0199.jpg 2010-09-16
IMG_0201.jpg
IMG_0201.jpg
IMG_0201.jpg 2010-09-16
IMG_0200.jpg
IMG_0200.jpg
IMG_0200.jpg 2010-09-16
IMG_0202.jpg
IMG_0202.jpg
IMG_0202.jpg 2010-09-16
IMG_0203.jpg
IMG_0203.jpg
IMG_0203.jpg 2010-09-16
IMG_0226.jpg
IMG_0226.jpg
IMG_0226.jpg 2010-09-23
IMG_0227.jpg
IMG_0227.jpg
IMG_0227.jpg 2010-09-23
IMG_0238.jpg
IMG_0238.jpg
IMG_0238.jpg 2010-09-27
IMG_0239.jpg
IMG_0239.jpg
IMG_0239.jpg 2010-09-27
IMG_0241.jpg
IMG_0241.jpg
IMG_0241.jpg 2010-09-27
IMG_0242.jpg
IMG_0242.jpg
IMG_0242.jpg 2010-09-27
IMG_0282 - Canopy (2).jpg
IMG_0282 - Canopy (2).jpg
IMG_0282 - Canopy (2).jpg 2010-10-05
IMG_0270 - Decking on Front Entrance Build-out (1).jpg
IMG_0270 - Decking on Front Entrance Build-out (1).jpg
IMG_0270 - Decking on Front Entrance Build-out (1).jpg 2010-10-05
IMG_0271 - Decking on Front Entrance Build-out.jpg
IMG_0271 - Decking on Front Entrance Build-out.jpg
IMG_0271 - Decking on Front Entrance Build-out.jpg 2010-10-05

Retaining Wall at Southwest Corner of Building

Retaining Wall

IMG_0287.jpg
IMG_0287.jpg
IMG_0287.jpg 2010-10-05
IMG_0288.jpg
IMG_0288.jpg
IMG_0288.jpg 2010-10-05
IMG_0304.jpg
IMG_0304.jpg
IMG_0304.jpg 2010-10-07
IMG_0303.jpg
IMG_0303.jpg
IMG_0303.jpg 2010-10-07
IMG_0306.jpg
IMG_0306.jpg
IMG_0306.jpg 2010-10-07
Axlerod  Construction Progress Oct 2010 031.jpg
Axlerod Construction Progress Oct 2010 031.jpg
Axlerod Construction Progress Oct 2010 031.jpg 2010-10-13
Axlerod  Construction Progress Oct 2010 048.jpg
Axlerod Construction Progress Oct 2010 048.jpg
Axlerod Construction Progress Oct 2010 048.jpg 2010-10-14
Axlerod  Construction Progress Oct 2010 050.jpg
Axlerod Construction Progress Oct 2010 050.jpg
Axlerod Construction Progress Oct 2010 050.jpg 2010-10-14
Axlerod  Construction Progress Oct 2010 075.jpg
Axlerod Construction Progress Oct 2010 075.jpg
Axlerod Construction Progress Oct 2010 075.jpg 2010-10-18
Axlerod  Construction Progress Oct 2010 076.jpg
Axlerod Construction Progress Oct 2010 076.jpg
Axlerod Construction Progress Oct 2010 076.jpg 2010-10-18
Axlerod  Construction Progress Oct 2010 184.jpg
Axlerod Construction Progress Oct 2010 184.jpg
Axlerod Construction Progress Oct 2010 184.jpg 2010-11-02
Axlerod  Construction Progress Oct 2010 204.jpg
Axlerod Construction Progress Oct 2010 204.jpg
Axlerod Construction Progress Oct 2010 204.jpg 2010-11-03

2nd Floor Elevated Deck, North Side

Concrete Pour & Finishing

Concrete Pour - 2nd Floor Elevated Deck, North Side.jpg
Concrete Pour - 2nd Floor Elevated Deck, North Side.jpg
Concrete Pour - 2nd Floor Elevated Deck, North Side.jpg 2010-09-08
Prepping for Concrete Pour (Welded Wire Fabric & Nelson Stud Installation), Nort
Prepping for Concrete Pour (Welded Wire Fabric & Nelson Stud Installation), Nort
Prepping for Concrete Pour (Welded Wire Fabric & Nelson Stud Installation), North side.jpg 2010-09-08
3rd Floor Concrete Finishing (1).jpg
3rd Floor Concrete Finishing (1).jpg
3rd Floor Concrete Finishing (1).jpg 2010-09-09

September 2010

Structural Steel Erection Continues in September

Structural Steel Erection Continues
Structural Steel Erection Continues
South Side of Building.jpg 2010-09-01
Setting Perimeter Steel Beam
Setting Perimeter Steel Beam
Southwest View.jpg 2010-09-08
Laying Corrugated Deck
Laying Corrugated Deck
4th Floor, West Side.jpg 2010-09-08
Roof Deck
Roof Deck
Shown with Galvanized Steel Beams Installed.jpg 2010-09-08
Galvanized Metal Mechanical Penthouse Structure.jpg
Galvanized Metal Mechanical Penthouse Structure.jpg
.jpg 2010-09-09

August 12, 2010 Steel Beam Erection

2010-08-12 Steel Beam Placed in Position

IMG_0099.jpg
IMG_0099.jpg
IMG_0099.jpg 2010-08-11
IMG_0101.jpg
IMG_0101.jpg
IMG_0101.jpg 2010-08-11
IMG_0102.jpg
IMG_0102.jpg
IMG_0102.jpg 2010-08-11
IMG_0103.jpg
IMG_0103.jpg
IMG_0103.jpg 2010-08-11
IMG_0104.jpg
IMG_0104.jpg
IMG_0104.jpg 2010-08-11
IMG_0105.jpg
IMG_0105.jpg
IMG_0105.jpg 2010-08-11
IMG_0106.jpg
IMG_0106.jpg
IMG_0106.jpg 2010-08-11

August 10, 2010: Structural Steel Erection

2010-08-10 Steel Erection

IMG_0026.jpg
IMG_0026.jpg
IMG_0026.jpg 2010-08-06
IMG_0036.jpg
IMG_0036.jpg
IMG_0036.jpg 2010-08-08
IMG_0037.jpg
IMG_0037.jpg
IMG_0037.jpg 2010-08-08
IMG_0042.jpg
IMG_0042.jpg
IMG_0042.jpg 2010-08-09
IMG_0043.jpg
IMG_0043.jpg
IMG_0043.jpg 2010-08-09
IMG_0067.jpg
IMG_0067.jpg
IMG_0067.jpg 2010-08-09

Stair Towers and Elevator Tower

2010-08-06 - Tower Erection

Elevator/Stair Tower #2, 1st Lift
Elevator/Stair Tower #2, 1st Lift
IMG_2362.jpg 2010-07-13
Elevator/Stair Tower #2, 2nd Lift
Elevator/Stair Tower #2, 2nd Lift
IMG_2369.jpg 2010-07-15
Start of 2nd Lift of Elevator/Stair Tower #2
Start of 2nd Lift of Elevator/Stair Tower #2
Placing of the slip form on the west side of Elevator/Stair Tower #2; to the left is a view of 3rd lift of Stair Tower #1 (2010-07-16)
2nd Lift at Elevator/Stair Tower #2
2nd Lift at Elevator/Stair Tower #2
Placement of slip form at Elevator/Stair Tower #2, 2nd Lift.jpg 2010-07-16
Can Form at 3rd Lift of Elevator/Stair Tower #2
Can Form at 3rd Lift of Elevator/Stair Tower #2
IMG_2404.jpg 2010-07-19
Concrete Pour of 4th Lift of Elevator/Stair Tower #2
Concrete Pour of 4th Lift of Elevator/Stair Tower #2
IMG_2426.jpg 2010-07-27
Concrete Pour - 4th Lift.jpg
Concrete Pour - 4th Lift.jpg
IMG_2427.jpg 2010-07-27
4th Lift Concrete Pour at Elevator/Stair Tower #2.jpg
4th Lift Concrete Pour at Elevator/Stair Tower #2.jpg
IMG_2428.jpg 2010-07-27
Stair Tower Work
Stair Tower Work
View of the removal of one of the slip forms from Stair Tower #2, with Stair Tower #3 in the background.jpg 2010-07-30
Stair Tower #3, 4th Lift.jpg
Stair Tower #3, 4th Lift.jpg
IMG_2443.jpg 2010-07-30
Stair Tower #3 w/view of Elevator Stair Tower #2
Stair Tower #3 w/view of Elevator Stair Tower #2
In the foreground is 4th Lift of Stair Tower #3. In the center is a concrete pour of 3rd lift of Elevator/Stair Tower #3.jpg 2010-07-27
Stair Tower Work.jpg
Stair Tower Work.jpg
View of 5th Lift of Stair Tower #1 and 4th Lift of Elevator/Stair Tower #2.jpg 2010-07-27
Stair Tower #1, 5th Lift
Stair Tower #1, 5th Lift
Stair Tower #1, 5th Lift.jpg 2010-08-04
View of Towers from South Parking Garage.jpg
View of Towers from South Parking Garage.jpg
View of Towers from South Parking Garage; stone foundation work to the left.jpg 2010-08-04
View of Stair Towers from Parking Garage.jpg
View of Stair Towers from Parking Garage.jpg
IMG_2445.jpg 2010-08-01

Elevator/Stair Tower #2 - Can Form Removal

Elevator/Stair Tower #2 - Can Removal

IMG_0002.jpg
IMG_0002.jpg
IMG_0002.jpg 2010-08-04
IMG_0009.jpg
IMG_0009.jpg
IMG_0009.jpg 2010-08-04
IMG_0010.jpg
IMG_0010.jpg
IMG_0010.jpg 2010-08-04
IMG_0011.jpg
IMG_0011.jpg
IMG_0011.jpg 2010-08-04
IMG_0012.jpg
IMG_0012.jpg
IMG_0012.jpg 2010-08-04
IMG_0013.jpg
IMG_0013.jpg
IMG_0013.jpg 2010-08-04

Foundation Work

Stair #1 North Tower

6.7.10 - Rebar & Prep Work for Stair #1 North Tower.JPG
6.7.10 - Rebar & Prep Work for Stair #1 North Tower.JPG
6.7.10 - Rebar & Prep Work for Stair #1 North Tower.JPG
6.23.10 - North Tower Form & Rebar 1.jpg
6.23.10 - North Tower Form & Rebar 1.jpg
6.23.10 - North Tower Form & Rebar 1.jpg 2010-06-23
6.23.10 - North Tower Rebar.jpg
6.23.10 - North Tower Rebar.jpg
6.23.10 - North Tower Rebar.jpg 2010-06-23
North Tower Electrical Work.jpg
North Tower Electrical Work.jpg
North Tower Electrical Work.jpg 2010-06-27

Stair #2 and Elevator Tower

6.21.10 - Waterproofing / Rebar.jpg
6.21.10 - Waterproofing / Rebar.jpg
6.21.10 - Waterproofing / Rebar.jpg
6.23.10 - Stair #2 & Elevator Tower Rebar .jpg
6.23.10 - Stair #2 & Elevator Tower Rebar .jpg
6.23.10 - Stair #2 & Elevator Tower Rebar .jpg
6.23.10 - Stair #2 & Elevator Tower Concrete Pour (1).jpg
6.23.10 - Stair #2 & Elevator Tower Concrete Pour (1).jpg
6.23.10 - Stair #2 & Elevator Tower Concrete Pour (1).jpg 2010-06-23
6.23.10 - Stair #2 & Elevator Tower Concrete Pour (2).jpg
6.23.10 - Stair #2 & Elevator Tower Concrete Pour (2).jpg
6.23.10 - Stair #2 & Elevator Tower Concrete Pour (2).jpg 2010-06-23
6.23.10 - Stair #2 & Elevator Tower Concrete Pour (3).jpg
6.23.10 - Stair #2 & Elevator Tower Concrete Pour (3).jpg
6.23.10 - Stair #2 & Elevator Tower Concrete Pour (3).jpg 2010-06-23
6.23.10 - Stair #2 & Elevator Concrete Pour (4).jpg
6.23.10 - Stair #2 & Elevator Concrete Pour (4).jpg
6.23.10 - Stair #2 & Elevator Concrete Pour (4).jpg 2010-06-23
6.23.10 - Stair #2 & Elevator Tower Concrete Pour (5).jpg
6.23.10 - Stair #2 & Elevator Tower Concrete Pour (5).jpg
6.23.10 - Stair #2 & Elevator Tower Concrete Pour (5).jpg 2010-06-23
6.23.10 - Stair #2 & Elevator Tower Concrete Pour (6).jpg
6.23.10 - Stair #2 & Elevator Tower Concrete Pour (6).jpg
6.23.10 - Stair #2 & Elevator Tower Concrete Pour (6).jpg 2010-06-23
6.23.10 - Stair #2 & Elevator Tower Concrete (7).jpg
6.23.10 - Stair #2 & Elevator Tower Concrete (7).jpg
6.23.10 - Stair #2 & Elevator Tower Concrete.jpg 2010-06-23

Stair #3 South Tower

6.4.10 -  Formwork for Stair #3 South Tower Foundation.jpg
6.4.10 - Formwork for Stair #3 South Tower Foundation.jpg
6.4.10 - Formwork for Stair #3 South Tower Foundation.jpg
6.23.10 - South Tower Form & Rebar 1.jpg
6.23.10 - South Tower Form & Rebar 1.jpg
6.23.10 - South Tower Form & Rebar 1.jpg
6.30.10 - South Tower Formwork & Ext. Waterproofing.jpg
6.30.10 - South Tower Formwork & Ext. Waterproofing.jpg
6.30.10 - South Tower Formwork & Ext. Waterproofing.jpg

Column Foundations

6.21.10 - Column Frame Work.jpg
6.21.10 - Column Frame Work.jpg
6.21.10 - Column Frame Work.jpg
6.23.10 - Column Foundation - Concrete Pour.jpg
6.23.10 - Column Foundation - Concrete Pour.jpg
6.23.10 - Column Foundation - Concrete Pour.jpg
6.9.10 - Embed Placement .JPG
6.9.10 - Embed Placement .JPG
6.9.10 - Embed Placement .JPG
6.4.10 Column Foundaton.jpg
6.4.10 Column Foundaton.jpg
6.4.10 Column Foundaton.jpg

Waterproofing

Waterproofing

6.23.10 - Concrete Work 027.jpg
6.23.10 - Concrete Work 027.jpg
6.23.10 - Concrete Work 027.jpg 2010-06-21
6.23.10 - Preprufe Substrate Waterproofing Membrane &Rebar.jpg
6.23.10 - Preprufe Substrate Waterproofing Membrane &Rebar.jpg

South Tower Exterior Bituthene Waterproofing.jpg
South Tower Exterior Bituthene Waterproofing.jpg

IMG_2310.jpg
IMG_2310.jpg
IMG_2310.jpg 2010-06-30
IMG_2312.jpg
IMG_2312.jpg
IMG_2312.jpg 2010-06-30
IMG_2327.jpg
IMG_2327.jpg
IMG_2327.jpg 2010-07-07

Vibroflotation

May 28, 2010

AXELROD PAVILION 060.jpg
AXELROD PAVILION 060.jpg
AXELROD PAVILION 060.jpg 2010-05-13
Vibroflotation Diagram.jpg
Vibroflotation Diagram.jpg
Vibroflotation Diagram.jpg 2010-05-28

Site Observations

Site Observations

Site clearing near completion.jpg
Site clearing near completion.jpg
Site clearing is near completion.
CCI Trailer On-Site.jpg
CCI Trailer On-Site.jpg
5.14.10 - CCI's trailer is on site, and ready for temporary power to be connected.
Vibroflotation Photo.jpg
Vibroflotation Photo.jpg
With vibroflotation work for the stone columns scheduled to begin, the mobile crane is on site and being assembled.

Site Work

2010-05-14

Axelrod Pavilion Aerial 3 4-13-10.jpg
Axelrod Pavilion Aerial 3 4-13-10.jpg
Axelrod Pavilion Aerial 3 4-13-10.jpg 2010-04-13
April 2010 - Axelrod Pavilion Progress Report Photos 001.jpg
April 2010 - Axelrod Pavilion Progress Report Photos 001.jpg
April 2010 - Axelrod Pavilion Progress Report Photos 001.jpg 2010-04-28
April 2010 - Axelrod Pavilion Progress Report Photos 001.jpg
April 2010 - Axelrod Pavilion Progress Report Photos 001.jpg
April 2010 - Axelrod Pavilion Progress Report Photos 001.jpg 2010-04-28
April 2010 - Axelrod Pavilion Progress Report Photos 003.jpg
April 2010 - Axelrod Pavilion Progress Report Photos 003.jpg
April 2010 - Axelrod Pavilion Progress Report Photos 003.jpg 2010-04-28
April 2010 - Axelrod Pavilion Progress Report Photos 016.jpg
April 2010 - Axelrod Pavilion Progress Report Photos 016.jpg
April 2010 - Axelrod Pavilion Progress Report Photos 016.jpg 2010-05-04
April 2010 - Axelrod Pavilion Progress Report Photos 017.jpg
April 2010 - Axelrod Pavilion Progress Report Photos 017.jpg
April 2010 - Axelrod Pavilion Progress Report Photos 017.jpg 2010-05-05
April 2010 - Axelrod Pavilion Progress Report Photos 024.jpg
April 2010 - Axelrod Pavilion Progress Report Photos 024.jpg
April 2010 - Axelrod Pavilion Progress Report Photos 024.jpg 2010-05-05
April 2010 - Axelrod Pavilion Progress Report Photos 028.jpg
April 2010 - Axelrod Pavilion Progress Report Photos 028.jpg
April 2010 - Axelrod Pavilion Progress Report Photos 028.jpg 2010-05-05

Axelrod Pavilion

New construction of a 100,000 SF - four story building on the campus of Morton Plant Mease Hospital in Clearwater, Florida.  The project will include breast imaging centers on the ground floor, with future medical office space on the three floors above. 

Owner: Morton Plant Hospital Assoc.
Architect: HKS Architects
Const. Manager: Creative Contractors


Visit Team Websites

Morton Plant Hospital Association, Inc.
HKS Architects, Inc.
Creative Contractors, Inc.

Engineers

Civil Engineer: Gulf Coast Consulting, Inc.
MEP/FP: Smith Seckman Reid, Inc.
Structural: Walter P. Moore & Associates
Landscape: Graham-Booth Landscape Architecture

Erica Imhoff, with SSR, is checking electrical installation at MRI Control Panel

SAFETY FIRST! Marc Hayes, CCI's APM, is sporting a safety harness!

Pelican Electrical Group - Coordination Meeting

CCI & MPH personnel coordinating installation of medical equipment.

Exterior glass and stucco at SW corner of building

Interior Framing

Steel Work at Mechanical Shaft

Roof Drains & Deck - Front Entrance Extension

2010-11-22

Axlerod  Construction Progress Oct 2010 157.jpg
Axlerod Construction Progress Oct 2010 157.jpg
Axlerod Construction Progress Oct 2010 157.jpg 2010-10-28
Axlerod  Construction Progress Oct 2010 159.jpg
Axlerod Construction Progress Oct 2010 159.jpg
Axlerod Construction Progress Oct 2010 159.jpg 2010-10-28

Installation of Structural Steel at Roof Level, North Side

Mechanical Penthouse

10-05-2010 Galvanized Steel Mechanical Penthouse

IMG_0218.jpg
IMG_0218.jpg
IMG_0218.jpg 2010-09-23
IMG_0220.jpg
IMG_0220.jpg
IMG_0220.jpg 2010-09-23
IMG_0221.jpg
IMG_0221.jpg
IMG_0221.jpg 2010-09-23
IMG_0222.jpg
IMG_0222.jpg
IMG_0222.jpg 2010-09-23
IMG_0223.jpg
IMG_0223.jpg
IMG_0223.jpg 2010-09-23
IMG_0224.jpg
IMG_0224.jpg
IMG_0224.jpg 2010-09-23
IMG_0245.jpg
IMG_0245.jpg
IMG_0245.jpg 2010-09-28

John Bowman, Inc. installs Nelson Stud on Corrugated Metal Deck

Guestbook - We'd love to hear your comments

7/24/2010 6:50:49 PM - 003044364297
As a team member of Morton Plant Hospital at Susan Cheek Needler Breast Center, it is exciting to see the Axelrod Pavillon coming along so well. Thank you for providing this site and for helping this dream come true.
With sincere gratitude, Mary Boles

Featured pictures

June 2010: Mock-Up Wall with Exterior Finishes

AXELROD PAVILION MOB IS NOW OPEN FOR BUSINESS

Pictured on the left is the Architect's rendering of the Axelrod Pavilion Medical Office Building.

 

Pictured, top right, is a view of the three stair towers erected - North Stair Tower #1, South Stair Tower #3, and the Elevator / Stair Tower #2.  We've come a long way since then!

 

Pictured, bottom right, is the Medical Office Building, completed and open for business.  Substantial Completion was obtained June 10, 2011.  A temporary Certificate of Occupancy was issued by the City of Clearwater on June 2, 2011, which allowed the Carlisle Imaging Center, Susan Cheek Needler Breast Center and Dr. Blumencrantz to begin their move into the building.  By the end of June, each of the offices had begun seeing patients.

 

.


Phase 1 - Road Work at Reynolds Avenue

2010-08-06 - Phase I North Asphalt Work and Sidewalk

Phase I North Asphalt Work
Phase I North Asphalt Work
Installation of base and asphalt for north driveway to Reynolds Avenue.
Sidewalk & Curbs
Sidewalk & Curbs
Monolithic poured sidewalk and curbs at Reynolds Avenue.

Related Pages

axelrodpavilion
What's New
Calendar
Aerial Photos
Map / Weather
Topping Out Lun...
Did you know?

1/28/2012 10:31:54 AM