YC098
work 004.JPG 2009-06-09

YC099
work 008.JPG 2009-06-11

YC100
work 005.JPG 2009-06-10

YC101
work 011.JPG 2009-06-11

YC 078
B unit

YC 079
A Unit 2008-12-19

YC 080
A unit office tower and fireplace

YC 081
The much anticipated Tree

YC 082
West Facade 12/19/08

YC 084
East facade 12/19/08

YC 083
Slopeside of B unit.

YC 086
B office tower and east facade from the north

YC 085
B unit stair tower.

YC072
North side 2008-10-24

YC073
B patio

YC074
A unit Entry hall and bridge viewed from great room

YC075
South face B unit

YC077
Closeup of log tails A office tower

YC076
Logs on A Office tower

YC 064.JPG
Front facade of A unit

YC 065.JPG
A unit entry

YC 066.JPG
West (Uphill) face of the building

YC 067.JPG
A unit deck

YC 068.JPG
Shed roofs between units

YC 069.JPG
B unit tower

YC 070.JPG
B unit front facade

YC 071.JPG
The North Face

YC 060.JPG
A unit facade

YC 061.JPG
View from the slopes

YC 062.JPG
A unit entry

YC 003.JPG
YC 003.JPG 2008-02-01

YC 004.JPG
YC 004.JPG 2008-02-01

YC 005.JPG
YC 005.JPG 2008-02-01

YC 008.JPG
The steel is up, walls are built and ready to be placed.

YC 009.JPG
A closer look at some of the steel.

YC 006.JPG
Progress! Lower level bearing walls are framed and most of them are standing.

YC 007.JPG
Blue sky is a nice change, even if it was only for a couple of hours.

YC 008.JPG
Lone Mountain is right back there, but today it's hiding in the clouds and snow.

YC 009.JPG
2/15. Starting to take shape.

YC 010.JPG
Finally a clear day.

YC 013.JPG
2008-02-23

YC 014.JPG
Joists are starting to roll.

YC 015.JPG
2008-02-23

YC 016.JPG
Second floor steel is up.

YC 017.JPG
Joists are rolling

YC 018.JPG
It'll be a nice view when it's all finished.

YC 019.JPG
Finally, the first pieces of decking.

YC 020.JPG
Joists are rolled.

YC 021.JPG
YC 002.JPG 2008-02-28

YC 023.JPG
Setting the four 40' parallam posts visible in the background was an adventure.

YC 022.JPG
Starting to look like a building.

YC 024.JPG
View from the road.

YC 025.JPG
A beatiful day

YC 026.JPG
A-unit coming out of the hole.

YC 027.JPG
A-unit upper floor framing is almost done.

YC 028.JPG
B-unit upper floor is ready for decking.

YC 029.JPG
Taken a few hours before six more inches of snow fell.

YC 030.JPG
Seven inches of new snow on May 9th.

YC 032.JPG
Matt on the moat.

YC 031.JPG
A few rafters are up! Lots more beams and rafters to go.

YC 034.JPG
B-unit from the South

YC 033.JPG
A-unit lower level after thawing.

YC 035.JPG
A-unit from the South

YC 036.JPG
The rear of the building.

YC 037.JPG
Beam work over the A-unit bridge.

YC 038.JPG
A-unit's main ridge.

YC 039.JPG
Nate looking very enthusiastic in the snow.

YC 040.JPG
B unit front facade.

YC 042.JPG
Matt and Dave enjoying the snow. Taken on June 6 at 1:18pm

YC 043.JPG
A few hours after the snow the sun came out again.

YC 044.JPG
Snow on June 6. The roof on B unit is coming along.

YC 045.JPG
Log accent in the A unit office tower.

YC 046.JPG
Benji in the A unit great room.

YC 047.JPG
The rear of the building (which faces the ski hill) I can't get back far enough to get the whole thing in the frame.

YC 048.JPG
A unit master bath.

YC 049.JPG
Timber tails on A unit

YC 050.JPG
A unit great room rafters and trusses

YC 051.JPG
A unit roof starting to take shape

YC 052
Log tails on A unit great room

YC 053
A unit office tower

YC 054
A unit 6/30/08

YC 055
B unit 6/30/08

YC 056
West side of A unit looking north

YC 057
Ceiling of B unit office tower.

YC 058
B unit great room

YC 059
Log tails at A unit deck

YC 078
B unit

goode place 05.JPG
Starting to look like a building.

goode place 06.JPG
Almost ready for housewrap and siding.

goode place 07.JPG
A view from the south.

goode place 01.jpg
The building front when framing with framing nearly complete.

goode place 02.jpg
A shot of the interior framing. Hanging the large steel beam on the left was, um, exciting.

goode place 08.JPG
Nate with the beam saw.

goode place 09.JPG
Matt attaching the last piece of corrugated steel.

goode place 10.JPG
The crew minutes after the final piece of siding was attached.

goode place 03.JPG
The completed building shortly before the first tenant opened for business.

goode place 04.JPG
A view of the building from the west.